Mumbai Interviews & Welding Tests on 11th & 12th September 2024
HABSHAN 1 Flare Line Replacement Works 950 MTS
ADNOC Gas, Abu Dhabi Piping & Fabrication Works:- Replacement of the existing Flare acid gas piping from Pipe rack 92 / 71 to Flare knock out drum with new piping in Habshan 1 plant.
Qatar Energy LNG Shutdowns 2025-2029
×
×
×
ADNOC Gas, Abu Dhabi
Piping & Fabrication Works:- Replacement of the existing Flare acid gas piping from Pipe rack 92 / 71 to Flare knock out drum with new piping in Habshan 1 plant.